Construction Projects > Tank bottom grout
Tank bottom grout
Project Details | Before & After Pictures
Date Completed: August 25, 2005
Client: Wells water district
Leaks in the floor of the tank had washed out the sand fill leaving voids under the steel plate and the tank unstable. PCS intalled injection ports in the floor and pumped a non shrink grout under the slab.


